SMS Lowestoft Proudly Supports the Port of London Authority

Ship repair momentum builds in Lowestroft as SMS finishes the refit of the "London Titan"

“The Southampton headquartered ship repairer and marine engineering services provider, SMS, has completed three refits this month to include the refit of the maintenance vessel ‘London Titan’ which returned to Lowestoft for the second time”.

 

SMS, has an enviable reputation as specialists in ship repair, marine engineering and major fabrication projects in the commercial marine, defence and Superyachts sectors.  This month the company has completed three major refits across its national and internationally network.

 

Chris Norman, the MD of SMS comments: “this marks a major milestone for the business as we’ve completed the last of three major ‘live’ refits that have been going on across the recently expanded ship repair Group.”

 

He goes on to say: “in recent months our business has gone from strength-to-strength; we’ve completed a significant refit in Avonmouth onboard the ‘City of Cardiff’ for Tarmac.  We’ve completed a refit in Cherbourg for Condor Ferries onboard their HSC ‘Condor Rapide’, the 86m Incat, and just this week we’ve undocked the ‘London Titan’ in Lowestoft for the Port of London Authority”.

 

James Grala, the General Manager of SMS Lowestoft comments: “the refit of the ‘London Titan’ has been a great project.  We’re pleased to welcome her back for her annuals; this is the second time she’s been into our Lowestoft dry dock.  Over a four week period the works included ship side valves inspections, painting of deck, hull and topsides.  Steel work repairs on the deck fixtures.  We relocated the off ballast valves spindles, and completed a program of bow thruster maintenance.  Works also included generator overhauls, deck lighting upgrades, tank cleaning, fendering repairs anode replacement and crane upgrades”.

 

Chris concludes by saying: “three different customers, three different markets, and three different locations - this is great example of the scale of SMS and the sort of turn-key solutions that we now provide.  We pride ourselves on bringing as many trades in-house as possible and on employing as many British nationals as possible.  We’re proud of that.  We’re very quickly building an enviable reputation for quality and versatility, not just in the aforementioned commercial arena but also in the Superyacht sector.  Having recently completed a further major refit in Shoreham on MY Spada we look forward to launch MY Alicia from a major three year refit later this month here in Southampton”.  The ‘City of Cardiff’ is an aggregate dredger, with a LOA 72m and a 15m beam.  The HSC ‘Condor Rapide’ is a fast ferry, with a LOA 86m and a 26m beam.  The ‘London Titan’ is a maintenance vessel with a LOA 36m and a 13.5m beam.

interested in finding out more?

Receive a call back from one of our dedicated team members.

client testimonials

You should be very proud of all that you do, it is wonderful.
Classic Yacht Owner
Many thanks for your rapid work today; we are back in action again
Chief Engineer, Solent Ship Operator
Please pass on my thanks and also the thanks from my Chief Executive and Operations Director, the support of the SMS team is very much appreciated
Head of Engineering, Solent Ferry Operator
Many thanks for your teams hard graft, the work was completed and as always I am extremely happy with the quality
Colour Sergeant, Royal Marines HM Naval Base Devonport
Thank the welders, the work that they produced was to the highest standard and were great to work with
Project Manager, UK Shipyard
ship repair call-out 2 hour response zones.
ship repair 2 hour response