Designed by Argyll Maritime Design Services the vessel has an overall length of 17. 25m, with a beam of 6.5m and draught aft on 1.4m on a 56 tonnes lightship displacement.

The Cromarty Queen was built to MCA Class 5 for up to 50 pax and four cars in C class waters. But she was also completed to work-boat code Cat 2 (12 passengers) to operate 20 miles offshore. For this role she has reinforced steelwork in place for the addition of a 17-tonne hydraulic crane, enabling her suitable for supply services to offshore platforms.

Central to her role as a car and passenger ferry is an innovative turntable arrangement built into the rear portion of the forward deck area which allows cars or similar sized vehicles to be driven onboard and turned ready for discharge over the bow ramp.

General

YARD NUMBER 102
DELIVERY DATE 01-Sep-2010
Basic Functions Car and Passenger Ferry, Evening Cruises

Dimensions

Length 17.25 m
Breadth 6.5 m
Depth at sides 2.0 m
Draught Aft 1.4 m
Displacement 68 t

Tank Capacities

Fiel Oil 4.4 m3
Freshwater 1.0 m3
Water Ballast  
Hydraulic Oil 0.25 m3

Performance

Bollard Pull Ahead 5 ton
Speed 9 knots

Propulsion Systems

Main Engines 2 x Doosan L136Ti
Total Power 169 kW (230 PS) at 2200 rpm
Gearboxes 2 x Doosan DMT110A 3.12:1
Propellers 2x BT Marine 800mm fixed pitch
Nozzles  
Steering Gear Dong-I DPS-350T5.7

Auxiliary Equipment

Generator Set Westerbeke, 230V 50Hz
Hydraulic Pumps  
Alarm Set Bilge, Fire, Hyd oil level
Bilge/Ballast Pump Jabsco 1-1/2″
Fuel Transfer Pump  
Freshwater Set Johnson Pump WPS 3.5 Uno Max

Accommodation

Wheelhouse Passenger Saloon, Toilet, Kiosk, Upper Passenger Deck

Navigation Equipment

Navigation Display  
Radar System Furuno 1835
Searchlight Jabsco 155SL
Compass Autonautic
GPS Furuno GP-32
Echo Sounder Furuno FCV-620
VHF Icom IC-GM651, Icom IC-M71

 

interested in finding out more?

Receive a call back from one of our dedicated team members.

client testimonials

You should be very proud of all that you do, it is wonderful.
Classic Yacht Owner
Many thanks for your rapid work today; we are back in action again
Chief Engineer, Solent Ship Operator
Please pass on my thanks and also the thanks from my Chief Executive and Operations Director, the support of the SMS team is very much appreciated
Head of Engineering, Solent Ferry Operator
Many thanks for your teams hard graft, the work was completed and as always I am extremely happy with the quality
Colour Sergeant, Royal Marines HM Naval Base Devonport
Thank the welders, the work that they produced was to the highest standard and were great to work with
Project Manager, UK Shipyard
ship repair call-out 2 hour response zones.
ship repair 2 hour response